85 kWp tenant electricity project on Cottbuser Straße and Pirnaer Straße successfully completed
2026 will be a strong year for the building energy transition. More and more roof areas are becoming energy sources – economically viable, scalable and sustainable. Existing buildings in particular show the potential of decentralised energy generation.
It all starts with a new project in Düsseldorf:
Together with Düsseldorfer Wohnungsgenossenschaft eG, SiSma has realised a photovoltaic system with 85 kWp output using a tenant electricity concept. The system on Cottbuser Straße 21–23 and Pirnaer Straße 2–4 is complete and will be connected to the grid at the end of February 2026. From then on, residents will benefit from locally generated green electricity straight from their own roof.

Project overview
Location: Cottbuser Str. 21–23 / Pirnaer Str. 2–4, Düsseldorf
CO₂ savings
approx. 40–45 tonnes
per year
4
Building connections
85 kWp
Installed capacity
Supply for approx.
30–35 households
Added value for housing companies and residents
Especially in existing buildings it becomes clear: when roof areas are used consistently and buildings are gradually and sustainably supplied with electricity– and in future also heat – there are multiple benefits:
- economic added value for owners and operators
- noticeable relief and participation for tenants
- a measurable contribution to a future-proof and climate-friendly energy supply
Tenant electricity models enable the direct use of energy generated on site while strengthening local security of supply.
Holistic energy concepts from SiSma
As an EPC and delivery partner, SiSma delivers holistic energy concepts for the housing industry and commercial property – from planning and implementation to system integration.
The range of services extends from:
- tenant electricity and shared building supply
- through large-scale photovoltaic systems on existing buildings
- to decentralised heat supply and district solutions
The projects are designed to be system-compatible, economical and scalable – in Germany and across Europe.

Outlook
The Düsseldorf project marks the start of an intensive year: in 2026, SiSma is delivering numerous further projects in the housing and commercial sectors. The building energy transition continues to gain momentum.


